Soils Stabilization
The Schmidt Technology & Training Center (STTC) has exhibited notable settling in certain portions of the building. A Geotechnical analysis and a report was commissioned to identify the likely source of the settling. Weak soils were identified in the area around the southwest corner, and stabilization was recommended. The scope of work for this project includes soil stabilization in this area with high-pressure, compaction grouting as described in the contents of the Project Manual.
There will be no pre-bid conference held. An optional pre-bid site visit is available. Contractors may schedule a site visit by contacting Alberto Othuon, Director of Facilities, Safety, and Security by email at aothuon@racc.edu or by phone at 610-372-4721 x5287. Prospective Contract Bidders may choose not to visit the site but, shall not be absolved of the responsibility to familiarize himself with the scope of work and existing conditions and obligations of the project scope.